Mining Upgrade · Module · Tech II
| Fact | Value |
|---|---|
| Mass | 1 kg |
| Volume | 5 m³ |
| Portion size | 1 |
| Base price | 24,960.00 ISK |
| Published | Yes |
Prices
| Market | Value |
|---|---|
| Jita 4-4 sell minimum | 570,500.00 ISK |
| Jita 4-4 buy maximum | 498,500.00 ISK |
| The Forge sell minimum | 570,500.00 ISK |
| The Forge buy maximum | 527,000.00 ISK |
| Sell volume | 10902 |
| Buy volume | 4977 |
| Snapshot loaded | 2026-09-07T23:30:43.989Z |
| HTTP last modified | 2026-09-07T22:50:04.000Z |
| Source | esi |
| Attribute | Value |
|---|---|
| CPU usage | 40 tf |
| Cpu Penalty | 12.5 % |
| Powergrid Usage | 1 MW |
| Attribute | Value |
|---|---|
| Structure Hitpoints | 40 HP |
| Attribute | Value |
|---|---|
| Meta Level | 5 Level |
| Tech Level | 2 Level |
| Attribute | Value |
|---|---|
| Primary Skill required | 22578 typeID |
| Attribute | Value |
|---|---|
| Mining Amount Bonus | 9 % |
Materials
| Type | Quantity |
|---|---|
| Tritanium | 676 |
| Mexallon | 318 |
| Isogen | 2 |
| Zydrine | 6 |
| Megacyte | 2 |
| Mechanical Parts | 8 |
| Miniature Electronics | 3 |
| Morphite | 5 |
| Laser Focusing Crystals | 8 |
Industry
| Blueprint | Activity | Quantity |
|---|---|---|
| Mining Laser Upgrade II Blueprint | manufacturing | 1 |
Variations
- 'Aoede' Mining Laser Upgrade (Storyline)
- 'Carpo' Mining Laser Upgrade (Storyline)
- Elara Restrained Mining Laser Upgrade (Tech I)
- Filmir’s Modified Mining Laser Upgrade (Officer)
- Mining Laser Upgrade I (Tech I)