Mining Upgrade · Module · Tech I
| Fact | Value |
|---|---|
| Mass | 1 kg |
| Volume | 5 m³ |
| Portion size | 1 |
| Base price | 24,960.00 ISK |
| Published | Yes |
Prices
| Market | Value |
|---|---|
| Jita 4-4 sell minimum | 34,420.00 ISK |
| Jita 4-4 buy maximum | 10,550.00 ISK |
| The Forge sell minimum | 34,420.00 ISK |
| The Forge buy maximum | 10,560.00 ISK |
| Sell volume | 15489 |
| Buy volume | 14088 |
| Snapshot loaded | 2026-09-08T09:21:47.399Z |
| HTTP last modified | 2026-09-08T08:49:54.000Z |
| Source | snapshot |
| Attribute | Value |
|---|---|
| CPU usage | 30 tf |
| Cpu Penalty | 10 % |
| Powergrid Usage | 1 MW |
| Attribute | Value |
|---|---|
| Structure Hitpoints | 40 HP |
| Attribute | Value |
|---|---|
| Meta Level | 0 Level |
| Tech Level | 1 Level |
| Attribute | Value |
|---|---|
| Primary Skill required | 22578 typeID |
| Attribute | Value |
|---|---|
| Mining Amount Bonus | 5 % |
Materials
| Type | Quantity |
|---|---|
| Tritanium | 676 |
| Mexallon | 318 |
| Isogen | 2 |
| Zydrine | 6 |
| Megacyte | 2 |
Industry
| Blueprint | Activity | Quantity |
|---|---|---|
| Mining Laser Upgrade I Blueprint | manufacturing | 1 |
Variations
- 'Aoede' Mining Laser Upgrade (Storyline)
- 'Carpo' Mining Laser Upgrade (Storyline)
- Elara Restrained Mining Laser Upgrade (Tech I)
- Filmir’s Modified Mining Laser Upgrade (Officer)
- Mining Laser Upgrade II (Tech II)