| Fact | Value |
|---|---|
| Max production limit | 1 |
Manufacturing
Time: 361h 6m 40s
| Type | Quantity |
|---|---|
| Structure Medical Center | 4 |
| Structure Office Center | 4 |
| Structure Construction Parts | 10 |
| Structure Hangar Array | 10 |
| Structure Storage Bay | 10 |
| Structure Repair Facility | 10 |
| Structure Docking Bay | 10 |
| Structure Laboratory | 40 |
| Type | Quantity | Probability |
|---|---|---|
| Large Laboratory | 1 |
| Skill | Level |
|---|---|
| Outpost Construction | 1 |
Copying
Time: 69h 26m 40s
Research material
Time: 13h 3m 20s
Research time
Time: 13h 3m 20s