Tools
Orders cover the selected hub region. Price history is regional, not station-specific.
Facts
| Fact | Value |
|---|---|
| Max production limit | 10 |
Manufacturing
Time: 39m
| Type | Quantity |
|---|---|
| Morphite | 1 |
| Gravimetric Sensor Cluster | 5 |
| Transmitter | 5 |
| Miniature Electronics | 5 |
| Gravimetric Backup Array I | 1 |
| Quantum Microprocessor | 1 |
| R.A.M.- Electronics | 1 |
| Type | Quantity | Probability |
|---|---|---|
| Gravimetric Backup Array II | 1 |
| Skill | Level |
|---|---|
| Industry | 5 |
| Electromagnetic Physics | 1 |
| Electronic Engineering | 1 |
Copying
Time: 31m 12s
| Type | Quantity |
|---|---|
| R.Db - Lai Dai | 1 |
| Data Sheets | 10 |
| Skill | Level |
|---|---|
| Electromagnetic Physics | 1 |
| Electronic Engineering | 1 |
Research material
Time: 13m 39s
| Type | Quantity |
|---|---|
| R.Db - Lai Dai | 1 |
| Consumer Electronics | 1 |
| Reports | 2 |
| Skill | Level |
|---|---|
| Metallurgy | 5 |
| Electromagnetic Physics | 1 |
| Electronic Engineering | 1 |
Research time
Time: 13m 39s
| Type | Quantity |
|---|---|
| R.Db - Lai Dai | 1 |
| Consumer Electronics | 1 |
| Reports | 2 |
| Skill | Level |
|---|---|
| Research | 5 |
| Electromagnetic Physics | 1 |
| Electronic Engineering | 1 |
Industry cost
Industry cost calculator · materials after Material Efficiency and an estimated job installation cost