Industry cost calculator

About

What does this cost to build? Every input after Material Efficiency and structure bonuses, plus an estimated job installation cost broken into its terms.

Blueprint

Mine it yourself inputs

Selected ores default to none. Choose named raw ores here, or explicitly choose Explore all eligible ores. Ore availability is never inferred from location.

Mining rate is optional. Without it, time and ISK per hour stay unknown. Extra build-route costs exclude shared mining, hauling, ship and blueprint costs.

Structure rigs and job taxes are owner-set and unreadable from ESI, so set them to match the structure you actually use. An NPC station has no rig slots and charges 0.25%.

Summary

Molok Blueprint

Runs: 1Material Efficiency: 0Produces: 1 MolokFacility: NPC stationCost index: 0.1718 in Jita

No material rig · High security · facility tax 0.25% (NPC default) · prices from Jita IV - Moon 4 - Caldari Navy Assembly Plant, The Forge · snapshot dated 2026-09-09 17:19 UTC · cost index fetched 2026-09-09 17:40 UTC

Blueprint requirements

Base manufacturing time per run, before bonuses: 3000h.

Blueprint skill requirements
SkillLevel
Capital Ship Construction5

Materials

Materials for 1 run at ME 0 · rounded once for the whole job
MaterialBase per runJob base (ME 0)RequiredSell price (ISK)Buy price (ISK)Line at sell (ISK)Line at buy (ISK)Adjusted pricePrice source
Enhanced Neurolink Protection Cell111 *19,990,000,000.00 ISK18,000,000,000.00 ISK19,990,000,000.00 ISK18,000,000,000.00 ISK625766891.5626662snapshot
Capital Core Temperature Regulator252525215,000,000.00 ISK187,800,000.00 ISK5,375,000,000.00 ISK4,695,000,000.00 ISK209762235.77448094snapshot
Capital Shield Emitter50505013,000,000.00 ISK11,800,000.00 ISK650,000,000.00 ISK590,000,000.00 ISK9916004.533293057snapshot
Capital Propulsion Engine80808012,050,000.00 ISK11,900,000.00 ISK964,000,000.00 ISK952,000,000.00 ISK13553442.785630876snapshot
U-C Trigger Neurolink Conduit96969616,550,000.00 ISK15,350,000.00 ISK1,588,800,000.00 ISK1,473,600,000.00 ISK380299.53353745886snapshot
G-O Trigger Neurolink Conduit96969614,400,000.00 ISK13,340,000.00 ISK1,382,400,000.00 ISK1,280,640,000.00 ISK489341.01432640775snapshot
Capital Sensor Cluster10010010013,940,000.00 ISK12,700,000.00 ISK1,394,000,000.00 ISK1,270,000,000.00 ISK12857599.062719734snapshot
Radar-FTL Interlink Communicator125125125119,300,000.00 ISK99,270,000.00 ISK14,912,500,000.00 ISK12,408,750,000.00 ISK8822420.453225484snapshot
Ladar-FTL Interlink Communicator12512512599,950,000.00 ISK91,090,000.00 ISK12,493,750,000.00 ISK11,386,250,000.00 ISK12501721.971794719snapshot
Capital Computer System20020020011,750,000.00 ISK11,140,000.00 ISK2,350,000,000.00 ISK2,228,000,000.00 ISK8801024.77949678snapshot
Capital Construction Parts2002002007,891,000.00 ISK5,375,000.00 ISK1,578,200,000.00 ISK1,075,000,000.00 ISK10191221.975252835snapshot
Capital Power Generator30030030012,900,000.00 ISK11,270,000.00 ISK3,870,000,000.00 ISK3,381,000,000.00 ISK17363040.69404932snapshot
Capital Jump Drive30030030019,000,000.00 ISK16,530,000.00 ISK5,700,000,000.00 ISK4,959,000,000.00 ISK11971084.29410546snapshot
Capital Turret Hardpoint4004004009,850,000.00 ISK7,416,000.00 ISK3,940,000,000.00 ISK2,966,400,000.00 ISK10726241.901620153snapshot
Capital Armor Plates40040040015,000,000.00 ISK14,990,000.00 ISK6,000,000,000.00 ISK5,996,000,000.00 ISK8733986.802847957snapshot
Capital Capacitor Battery40040040011,990,000.00 ISK11,920,000.00 ISK4,796,000,000.00 ISK4,768,000,000.00 ISK9432278.719171464snapshot
Capital Jump Bridge Array50050050035,990,000.00 ISK32,010,000.00 ISK17,995,000,000.00 ISK16,005,000,000.00 ISK19259752.023633316snapshot
Capital Clone Vat Bay50050050023,260,000.00 ISK19,160,000.00 ISK11,630,000,000.00 ISK9,580,000,000.00 ISK15217674.383632902snapshot
Capital Doomsday Weapon Mount50050050029,840,000.00 ISK20,020,000.00 ISK14,920,000,000.00 ISK10,010,000,000.00 ISK17107741.304931812snapshot
Capital Ship Maintenance Bay50050050015,950,000.00 ISK14,990,000.00 ISK7,975,000,000.00 ISK7,495,000,000.00 ISK15722534.828720892snapshot
Capital Corporate Hangar Bay50050050013,100,000.00 ISK5,089,000.00 ISK6,550,000,000.00 ISK2,544,500,000.00 ISK13366230.127350569snapshot
Life Support Backup Unit1,6001,6001,60077,540.00 ISK76,380.00 ISK124,064,000.00 ISK122,208,000.00 ISK9076.655075641896snapshot
Auto-Integrity Preservation Seal3,2003,2003,20047,480.00 ISK46,260.00 ISK151,936,000.00 ISK148,032,000.00 ISK8191.2524853452815snapshot

* Held at one unit per run: every run needs at least one of every listed material, however far Material Efficiency and rigs reduce it.

Installation cost

Estimated installation cost · EIV 76,018,052,444.50 ISK x 0.2143
TermRateCost (ISK)
System cost index 0.17180.171813,059,901,409.96 ISK
Facility tax 0.25%0.0025190,045,131.11 ISK
SCC surcharge 4%0.043,040,722,097.78 ISK
Installation cost0.214316,290,668,638.86 ISK

Cost and margin

Total cost against what the Molok sells for
ScenarioMaterials (ISK)Installation (ISK)Total cost (ISK)Cost per unit (ISK)Revenue (ISK)Profit (ISK)Margin
Buy the inputs from sell orders and sell the product to buy orders146,330,650,000.00 ISK16,290,668,638.86 ISK162,621,318,638.86 ISK162,621,318,638.86 ISK51,390,000.00 ISK-162,569,928,638.86 ISK-316345.-45%
Buy the inputs with buy orders and list the product at the sell price123,334,380,000.00 ISK16,290,668,638.86 ISK139,625,048,638.86 ISK139,625,048,638.86 ISKUnknownUnknownUnknown

Material modifier

Material modifier 1 · multiply these to reproduce it
MultiplierValue
Material Efficiency 01
Material modifier1

Caveats

  • CCP has never published a job cost or Estimated Item Value formula. The installation cost below is an estimate built from the Viridian expansion notes and community reverse engineering, not an official figure.
  • ESI reports the system cost index rounded to four decimal places while the server uses full precision, so the installation cost is approximate by construction.
  • No ESI route exposes a player structure's fitted rigs or its industry tax rate, so the structure, rig and tax above are whatever you selected. This page does not know how any real structure is configured.
  • Single level only. A material that is itself manufacturable is priced at the market here, not built. Component build trees are not part of this page.
  • The Estimated Item Value uses ME-0 base quantities and CCP adjusted prices. It is deliberately not reduced by Material Efficiency, the structure role bonus or a rig.
  • Invention, reactions, copying and research are out of scope. Manufacturing time is the SDE base time per run, before skill or facility time bonuses.

Formats