Industry cost calculator

About

What does this cost to build? Every input after Material Efficiency and structure bonuses, plus an estimated job installation cost broken into its terms.

Blueprint

Mine it yourself inputs

Selected ores default to none. Choose named raw ores here, or explicitly choose Explore all eligible ores. Ore availability is never inferred from location.

Mining rate is optional. Without it, time and ISK per hour stay unknown. Extra build-route costs exclude shared mining, hauling, ship and blueprint costs.

Structure rigs and job taxes are owner-set and unreadable from ESI, so set them to match the structure you actually use. An NPC station has no rig slots and charges 0.25%.

Summary

Standup M-Set Missile Precision I Blueprint

Runs: 1Material Efficiency: 0Produces: 1 Standup M-Set Missile Precision IFacility: NPC stationCost index: 0.1716 in Jita

No material rig · High security · facility tax 0.25% (NPC default) · prices from Jita IV - Moon 4 - Caldari Navy Assembly Plant, The Forge · snapshot dated 2026-09-09 22:19 UTC · cost index fetched 2026-09-09 22:40 UTC

Blueprint requirements

Base manufacturing time per run, before bonuses: 50m.

Blueprint skill requirements
SkillLevel
Industry1

Materials

Materials for 1 run at ME 0 · rounded once for the whole job
MaterialBase per runJob base (ME 0)RequiredSell price (ISK)Buy price (ISK)Line at sell (ISK)Line at buy (ISK)Adjusted pricePrice source
Alloyed Tritanium Bar1301301302,072.00 ISK1,777.00 ISK269,360.00 ISK231,010.00 ISK1784.0277525126146snapshot
Ward Console40040040010,100.00 ISK9,704.00 ISK4,040,000.00 ISK3,881,600.00 ISK10892.788428490587snapshot
Scorched Telemetry Processor6006006002,840.00 ISK2,802.00 ISK1,704,000.00 ISK1,681,200.00 ISK63.93384559728721snapshot
Malfunctioning Shield Emitter600600600868.30 ISK628.30 ISK520,980.00 ISK376,980.00 ISK395.3117437938324snapshot
Contaminated Lorentz Fluid60060060071,000.00 ISK70,510.00 ISK42,600,000.00 ISK42,306,000.00 ISK370.53384211335197snapshot
Tangled Power Conduit600600600114,400.00 ISK95,010.00 ISK68,640,000.00 ISK57,006,000.00 ISK414.146306620175snapshot
Broken Drone Transceiver6006006002,800.00 ISK2,560.00 ISK1,680,000.00 ISK1,536,000.00 ISK77.31556578951597snapshot
Damaged Artificial Neural Network600600600597.00 ISK491.00 ISK358,200.00 ISK294,600.00 ISK275.7606207172223snapshot
Thruster Console6006006007,443.00 ISK7,357.00 ISK4,465,800.00 ISK4,414,200.00 ISK42.43574344027444snapshot
Conductive Polymer60060060022,100.00 ISK19,500.00 ISK13,260,000.00 ISK11,700,000.00 ISK398.95941256993297snapshot

Installation cost

Estimated installation cost · EIV 5,812,077.23 ISK x 0.2141
TermRateCost (ISK)
System cost index 0.17160.1716997,352.45 ISK
Facility tax 0.25%0.002514,530.19 ISK
SCC surcharge 4%0.04232,483.09 ISK
Installation cost0.21411,244,365.73 ISK

Cost and margin

Total cost against what the Standup M-Set Missile Precision I sells for
ScenarioMaterials (ISK)Installation (ISK)Total cost (ISK)Cost per unit (ISK)Revenue (ISK)Profit (ISK)Margin
Buy the inputs from sell orders and sell the product to buy orders137,538,340.00 ISK1,244,365.73 ISK138,782,705.73 ISK138,782,705.73 ISK109,200,000.00 ISK-29,582,705.73 ISK-27.-9%
Buy the inputs with buy orders and list the product at the sell price123,427,590.00 ISK1,244,365.73 ISK124,671,955.73 ISK124,671,955.73 ISK125,000,000.00 ISK328,044.27 ISK0.26%

Material modifier

Material modifier 1 · multiply these to reproduce it
MultiplierValue
Material Efficiency 01
Material modifier1

Caveats

  • CCP has never published a job cost or Estimated Item Value formula. The installation cost below is an estimate built from the Viridian expansion notes and community reverse engineering, not an official figure.
  • ESI reports the system cost index rounded to four decimal places while the server uses full precision, so the installation cost is approximate by construction.
  • No ESI route exposes a player structure's fitted rigs or its industry tax rate, so the structure, rig and tax above are whatever you selected. This page does not know how any real structure is configured.
  • Single level only. A material that is itself manufacturable is priced at the market here, not built. Component build trees are not part of this page.
  • The Estimated Item Value uses ME-0 base quantities and CCP adjusted prices. It is deliberately not reduced by Material Efficiency, the structure role bonus or a rig.
  • Invention, reactions, copying and research are out of scope. Manufacturing time is the SDE base time per run, before skill or facility time bonuses.

Formats